RSS RSS Subscribe

Debris All Over The Place

By Threelight, 27 April, 2010 10:53 pm

At the moment there is a small amount of upheaval in Chez Threelight. We are having a new shower put in at present, and it’s likely to be a week until everything’s back to normal, and we get a new shower. The two contrasts of workmen, the one now vs the one last time (January 2009, if memory serves) is striking. This one turns up on time (unlike the one last year who turned up at odd times and worked until about 8 or 9pm). The sheer professionalism of the one here now is there to be seen. There is a lot to be done, ripping out what the former “workman” did. At least here, everything will be wired in and all correct. I could go into a long list about what was wrong last year, but it’s such a long list, I could be here all night (wrong procedures and wrong parts).

So, soon we will be getting a brand new bathroom (again), The old one has been ripped out, along with the sink which will be repositioned to a more logical place than it was before. And also the shower will be slightly bigger. Hopes are high that it’ll look quite good.

Leave a Reply

WordPress Themes